Improvement Suggestions for Mecway

Dear Madam/Sir,
Is it possible to add continue from one analsysis to another option? In example, I am a civil engineer and I analyze structures with first gravity loads (linear-nonlinear static) than after that load, transient dynamic (linear-nonlinear) for earthquake loads. Also, is it possible to add combination support? In example my structure is loaded with wind loads and I want to add live loads or dead loads (gravity). This should be with factors, in example, 1.4 Dead + 1.2 Live

Comments

  • It can't automatically run several analyses.

    You can combine loads in different combinations by using a separate configuration for each case. Suppress the unwanted loads in each configuration.

    You can write the factors directly into the loads using multiplication symbol (*) but there are no variables to apply the same factor to multiple loads.
Sign In or Register to comment.

Howdy, Stranger!

It looks like you're new here. If you want to get involved, click one of these buttons!